Skip to product information
1 of 9

8.5ft H (1 Post w/Planter Box) Freestanding Zippity Concord String Light Post for Outdoor Hanging Lights, Light Poles for Outside Balcony Lights, Patio Decor for String Lights, ZP19081

8.5ft H (1 Post w/Planter Box) Freestanding Zippity Concord String Light Post for Outdoor Hanging Lights, Light Poles for Outside Balcony Lights, Patio Decor for String Lights, ZP19081

Quantity
Regular price $343.12
Regular price Sale price $343.12
Sale Sold out
  • 24/7 Customer Support
  • Risk-Free 30-Day Returns
  • Fast & Reliable U.S. Shipping

30-Day Hassle-Free Returns

Not satisfied? Return your order within 30 days for a full refund or exchange — simple and easy.

✔ Easy return process

✔ Fast refunds

✔ No hidden conditions

Fast U.S. Shipping

We ship within the United States only — no international delays.

✔ Processing time: 1–2 business days

✔ Delivery time: 3–7 business days

✔ Real-time tracking available

👉 Track your order anytime from the header via Track Order

About This

  • ONE LIGHT POST PER PURCHASE: You will receive one unassembled wood string light post with planter box per purchase
  • EASY TO ASSEMBLE: This wood string light pole assembles in approximately 60 minutes with only a power drill. You will receive materials for 1 pole for outdoor string lights. String lights are not included
  • FREESTANDING: No need to worry about messing with concrete or digging holes. This light post sits firmly in an aluminum reinforced FSC certified wood planter box
  • PLANTER BOX BASE: The planter box measures 22.5in H x 20in W x 20in L and the floorboard can be assembled at depths of 5" or 9.5". Before adding soil, we recommend filling the bottom chamber with at least 50lbs of small rocks or sandbags
  • DURABLE AND STURDY: Unlike flimsy aluminum light poles that bend and rust over time, our strong, FSC certified wood light post is reinforced by anodized posts around the planter box which provide additional stability. We recommend a distance of 144” (12ft) between light poles
  • BEAUTIFUL LIGHTING SOLUTION: Standing at over 8.5 ft tall, our string light pole with planter box for outside transforms any space into an oasis. Backyards, decks, patios, and gardens become the perfect setting for outdoor hanging lights
  • INCLUDED ACCESSORIES: We include an ornate decorative post cap and a powder coated aluminum hook to hang your string lights at any height along your wood post. String lights are not included.

Overview

  • Color : Cedar
  • Brand : Zippity Outdoor Products
  • Material : Wood
  • Item dimensions L x W x H : 20 x 20 x 103.5 inches
  • Item Weight : 46 Pounds
View full details
Free Shipping
Free Shipping on Orders Over $50
Easy Returns
30-Day Hassle-Free Returns
Secure Payment
Secure & Encrypted Checkout
Customer Support
24/7 Customer Support

Lighting That Makes Every Space Feel Better

  💡 about us
LightHubStore helps you upgrade your home, outdoor space, workspace, and vehicle with lighting designed for better comfort, style, and everyday function.
From LED lights and smart lighting to outdoor, solar, decorative, and car lighting, we bring together practical lighting solutions that make every space brighter, safer, and easier to enjoy.
1000+ Delivered Fast Across the U.S.
1000+ Trusted by Thousands of Buyers
Shop Our Most Popular Lighting Picks
LED Lights
Outdoor Lighting
Smart  Lights
Ceiling Fans with Light
Car Lights
Solar Lights

Upgrade Your Lighting — See the Difference Instantly

  💡 before & after

Poor lighting makes spaces feel dull, uncomfortable, and outdated.

The right lighting transforms brightness, mood, and functionality—instantly.

MODERN LED & SMART LIGHTING 95 %
Energy Saving & Long-Lasting 90 %

Why Choose LightHubStore

  💡 why customers trust us

We focus on lighting that actually improves how your space looks, feels, and works.

From everyday home lighting to smart and outdoor solutions, everything is selected for performance, simplicity, and real results.

90%

ENERGY SAVING

89%

SMARTER UPGRADES

93%

Easy DIY Lighting Setup

95%

Make Your Home Safer with Outdoor Lighting

What Customers Ask Most

What type of lighting is best for my home?
remove
add

Choose lighting based on your space.

LED for everyday use, smart lighting for convenience, outdoor lighting for safety, and decorative lighting for atmosphere.

Are LED lights really worth it?
remove
add
Yes. LED lights last longer, use less energy, and provide better brightness than traditional bulbs.
What brightness (lumens) do I need?
remove
add

For most rooms, 800–1600 lumens works well.

Higher lumens = brighter light.

What color light should I choose?
remove
add

2700K–3000K = warm & cozy

4000K = neutral & clean

5000K+ = bright & daylight

Do smart lights work with Alexa or Google?
remove
add
Yes. Most smart lights support voice control, apps, scheduling, and automation.
Are solar lights bright enough?
remove
add

Solar lights are great for pathways, gardens, and ambiance.

For strong brightness, choose high-lumen models.

What outdoor lighting improves home safety?
remove
add
Pathway lights, motion sensor lights, and wall lights improve visibility and security.
Is lighting easy to install?
remove
add
Most modern lighting is DIY-friendly and can be installed in minutes.
Smartphone with email subscription interface on a table with a cup of coffee and plant.

Unlock Exclusive Offers

Be the first to know about new collections and exclusive offers.

Subscribe Now